How Long Does It Take Green Shield To Build?

Green Shield handles all permits and completes most custom decks in five days with focused, in-house crews.

FAQ How Long Does It Take Us To Build Horizontal

Description

Green Shield believes that a homeowner's time is as valuable as the project itself. Unlike traditional contractors who juggle multiple job sites at once, our team follows a strict "focused completion" policy: we don’t leave your project until the final board is inspected and the job is complete.

The Focused Build Standard:

  • Dedicated On-Site Presence: Once Green Shield begins your build, our crew is assigned exclusively to your home. We do not move to another project until your "Forever Deck" is finished to its entirety, ensuring professional consistency from start to finish.
  • The 5–6 Day Standard: By utilizing skilled, in-house W-2 craftsmen and smarter engineering, our team typically completes builds within five to six days. We prioritize an efficient workflow to minimize the footprint of construction on your daily life.
  • Reliable Turnaround: Our goal is to bridge the gap between demolition and your first afternoon on your new deck. By maintaining a single-site focus, we eliminate the delays common with subcontractors and "disappearing" crews.

Green Shield refuses to let your project linger. By providing a reliably engineered schedule and a dedicated team, we ensure your outdoor living space is built for the long haul—and ready to enjoy sooner. Visit the Green Shield website to see how our "one-site" commitment sets the premier standard in Michigan.

Transcription

We do not leave a project until a project is complete.  We want to make sure your project is done into its entirety  before we start the next project.  Our goal is to be in and out of there as quickly as possible.  The vast majority of projects are done  on an average of five to six days.  So the goal is to get out very quickly.  So that way you can get on to enjoying your deck.